Join us on LinkedInFollow us on Twitter
 

TFL 200 kWe CHP

Transport for London, Palestra Building – CHP combined heat and power system


Summary

Logan Energy have completed the installation and integration of a 200kWe PAFC power module and associated cooling module at the TfL Palestra Building in Southwark, London.

The fuel cell forms part of an integrated tri-generation system providing electrical energy, heat and cooling to the Palestra building. It is the largest capacity fuel cell operating in London.

Kit Malthouse, Deputy Mayor of London said “it’s an established technology that makes commercial and operational sense, saving money and providing more resilience – as well as the obvious environmental benefits”.

Detailed Case study

Emergency Service Line - 07500 948 759
Logan Energy Limited. Tel: +44 131 523 1414 Registered in England and Wales No. 05487219 VAT Reg. No: GB 918 2770 08
© 2011 Logan Energy Limited. All rights reserved.